We’re delighted to have reached one of the major milestones of this summer’s renovation. The cooling floor has been poured! It’s now covered in plastic for a few weeks as part of the curing process – while lots of other work happens around it. You can watch a time lapse of the process below:
A total of 14.5 miles of pipe were installed in the renovation. The cooling floor required 22 concrete lorry deliveries to pour 138 cubic meters of concrete to a depth of 100 millimetres. The earlier pour of the heating mat layer consisted of 204 cubic meters of concrete with a depth of 150 millimetres.